welcome在线登录入口

  • <tr id='aTeGwb'><strong id='aTeGwb'></strong><small id='aTeGwb'></small><button id='aTeGwb'></button><li id='aTeGwb'><noscript id='aTeGwb'><big id='aTeGwb'></big><dt id='aTeGwb'></dt></noscript></li></tr><ol id='aTeGwb'><option id='aTeGwb'><table id='aTeGwb'><blockquote id='aTeGwb'><tbody id='aTeGwb'></tbody></blockquote></table></option></ol><u id='aTeGwb'></u><kbd id='aTeGwb'><kbd id='aTeGwb'></kbd></kbd>

    <code id='aTeGwb'><strong id='aTeGwb'></strong></code>

    <fieldset id='aTeGwb'></fieldset>
          <span id='aTeGwb'></span>

              <ins id='aTeGwb'></ins>
              <acronym id='aTeGwb'><em id='aTeGwb'></em><td id='aTeGwb'><div id='aTeGwb'></div></td></acronym><address id='aTeGwb'><big id='aTeGwb'><big id='aTeGwb'></big><legend id='aTeGwb'></legend></big></address>

              <i id='aTeGwb'><div id='aTeGwb'><ins id='aTeGwb'></ins></div></i>
              <i id='aTeGwb'></i>
            1. <dl id='aTeGwb'></dl>
              1. <blockquote id='aTeGwb'><q id='aTeGwb'><noscript id='aTeGwb'></noscript><dt id='aTeGwb'></dt></q></blockquote><noframes id='aTeGwb'><i id='aTeGwb'></i>
                园林绿※化工程
                • 园林绿化工程

                园林绿化工程

                马上咨询
                客服电话
                17710848605(谭先生)

                园林绿化工程

                城市园林绿化工程施工及验收规范

                城市园林绿化工程施工及验收规范定了城市园林绿化施工前准备,植物材料和种子、种植土壤处理,种植穴(槽)的挖掘,苗木运输和嫁植,苗木种植前的修剪,各类植物的种植,屋顶绿化,地下设施覆土绿化。垂直绿化、斜面护坡绿化、绿化工程、附属设施和工程验收等基本要求。

                《园林绿化工程项目规范》为国家标准编号为GB55014-2021,自2022年1月1日起实施,住房和城乡建设部门门户网站(www.mohurd.gov.cn),园林施工方案的编制

                一 .确定施工程』序:

                1.接受任务阶段,2.开工前准备阶段,3.单位工程施工中应遵循程序 ,4.竣工验收阶段。

                二. 确定施工起点流向。

                三. 确定施工顺序。

                施工顺序@是指部分工程施工的先后顺序,合理的制定施工顺序是编制和施工进度的需要ξ 。

                确定施工顺序时,一般应考虑以下因素 :

                1.遵循施工程序? 2.符合施工工艺? 3.与施工方法一致? 4.按照施工组织的要求? 5.考虑施工安全和质量? 6.考虑当地气候的影响

                在线客服
                在线客服